Basic Info.
Model NO.
MC
Installation Method
Fixed
Stroke
Four Stroke
Cooling Method
Air Cooled
Output Type
AC Three Phase
Speed
Low Speed
Conditions of Use
Land Use
Usage
Common Units, Standby Unit, Emergency Crew
Landuse Type of Unit
Automation Type
Excitation Mode
Static Exciter
Engine Brand
Beinei Air Cooled
Alternator Brand
Stamford/Marathon/Mecca and Unique Brand for Usage
Control Panel
Deepsea/Comap/Datakom/Delixi/Smartgen and Others
Genset Generator
Water Cooled/Air Cooled
Canopy Type
Silent Soundproof/Weather Proof/Anti-Rusted Proof
Frequency(Hz)
50Hz/60Hz
Voltage Output
230/400V
Application[a]
Telecom Communication/Hospital/ Construction
Application[B]
Mining/Data Center/Commercial/Industrial
Accessory[a]
Spare Parts Documents
Accessory[B]
Tool Kit
Governing Type
Mech/Elec/ECU/Ecm/Adec/Hpcr
Fuel Tank
with Big/1000L/1500L/2000L/3000L Fuel Tank
Certificate Available
CE, ISO, OEM Authorization etc.
Dg Generator
Small Diesel Generator
Transport Package
Both Standard Marine Packing or Compact Packing.
Specification
As below Spec. with details
Trademark
Mecca
Origin
China
HS Code
85021100
Production Capacity
1000/Year
Product Description
Mecca Power, as part of a Global Power Supplier initiative, provides a professional solution for the design, application and after-sales support of generators.
Strongly focused on innovation and the inherent flexibility of product design, Mecca Power has been successful in global markets with a broad and diverse range of genset power products that can operate autonomously or independently. parallel, on-site or remotely controlled.
- Brand new air cooled Beinei diesel engine generators ;
- 2 fuel tanks,one is 50L standard base fuel tank and another one is 2000L separately fuel tank.
- Set mounted with Deepsea DSE6020 digital controller. Breaker included.
- 24V DC Electric start system with maintenance free starting batteries and battery chargers .
- Genset will be with 8-10Hrs daily fuel tank.
- Low Noise -- Cylinder liner and crankcase are all made in high strength grey cast iron (German standard) with optimal design to reduce the noise and vibration
- Package: Generators will be packed in poly foam.
Payment Terms:
By telegraphic transfer: 30% deposit on signing of sales contract; and balance 70% before dispatch.
Delivery:
Approximately 2-4 weeks upon order confirmation.
Service Guarantee:
Before Service: According to the clients' requirement and actual situation, we will furnish the technology consultation and kinds of information.
After Service: Guarantee for one year or 1200 running hours (accord to whichever reach first) from installed date.
During the guarantee period, we will provide the free easy-damaged spare-parts for problems caused by our quality of production or raw material, except the damageable spare parts of diesel engine caused by customer's incorrect man-made operation. After checking, our company provides cost spare-parts maintenance for gensets .
Beside genset one-stop purchasing service to world-wide customers,CKD and SKD packing service are also available according to unique request.
CKD:Complete Knock Down Generator
Generator completely knocked down into parts without assembling.
All items from following are seperately packed without connection.
SKD:Semi Knock Down Generator
Partially assembled generator.
Part of the following items you choose will be assembled.
Advantage:
Prompt delivery
Reduced tax to win more competition
Lower transportation fees to save cost
Localized production to win more tenders.
Increased production to offer more job opportunity for the government
-----------------------------------------------------------------------------------------------MAINTENANCE---------------------------------------------------------------------------------------------
General Troubleshooting
This section lists the generating set for some common fault, the reasons for the failure and determines the
method of fault. General operators can determine their own fault and note, maintenance it according to the
brochure. But please contact the repairing agents when meeting a special note or not listed failure of operation.
Please remember the following suggestions before repairing:
- Make sure that study the failure carefully before any operation.
- Repair with the easiest way and most commonly used method.
- Find the exact causes of failure and completely solve the fault.
1. Generator Sets
Description of this section is for reference only. If the following failure occurs please contact the repairing agents.
(Some models of control panel installed only parts of the following warning indicator light)
Introduction of Maintenance grade(Interval) for the generator set
A Level Maintenance Interval (Daily Maintenance)
1. Check Daily Report of Genset .
2. Check fuel level and coolant level.
3. Check alternator for cracks or other damage, and the condition of the belts must be checked, flab or
other damage.
4. Check the Air filter. The air filter should be replaced when necessary .
5. Release fuel tank and fuel filter's water and sediment.
6. Check the water cooling filter.
7. Check starting battery and electrolyte, add electrolyte when necessary.
8. Check the starter, check noisy defect.
9. Use air syringe cleaner to clean the water tank, coolant system and cooled fin net.
B Level Maintenance Interval (Less than 400 hours)
1. Repeatedly check A Level Daily Maintenance steps.
2. After operating 100 to 250 hours, replace the fuel filter. All the fuel filters should not be cleaned, it
should be replaced. 100 to 250 hours is just flexible time, actually it must be according to the practice
and real fact.
3. After operating 200 to 250 hours, replace the oil & oil filter. All the lube oil must fit up to the CF
Grade of American Petroleum Institute.
4. After operating 300 to 400 hours, replace the air filter. The air filter can be cleaned with air syringe, or
it can be replaced. The replacement must be according to the environment and real fact.
5. Replace the cooling system and add coolant concentration.
6. Clean the crankshaft and inlet, outlet air- filter net.
C Level Maintenance Interval (2000-3000 hours), Please do as follows:
1. Repeatedly check A and B Level Daily Maintenance steps.
2. Remove the tap of valve, clean and wash oil dirt and sludge.
3. Fasten snails from each part (including running parts and fixed parts)
4. Clean and wash the crankcase, oil sludge, steel scraps and sediment with engine.
5. Check wearing of the engine turbo, clean and wash accumulation of carbon, adjust it when necessary.
6. Check and adjust valve clearance.
7. Check PT pump, quality of injection, adjust injection process, adjust it when necessary.
8. Check and adjust the tension of fan belt and water pump belt, adjust and replace it when necessary;
clean and wash water tank radiator fins, then check the using capability of thermostat.
Current Repair (D Level Maintenance)(3000-4000 hours)
1. Check valve, valve seat and other wearing, repair or change it when necessary.
2. Check P pump, quality of injection, repair and adjust it when necessary.
3. Check and adjust connecting rod and fastening twisting torque.
4. Check and adjust valve clearance.
5. Check the trip of injector.
6. Check and adjust tension of fan and generating belt.
7. Clean and wash accumulation of carbon in inlet pipes.
8. Clean and wash the core of air cooler.
9. Clean and wash the whole oil lubrication system.
10. Clean and wash room of rocker arm, oil sludge in the sump and Metal scrap-iron.
Medium Repair (6000-8000 hours)
1. Including the items of minor repair.
2. Disassemble generator(except crankshaft)
3. Check the easy worn spare parts in pitman shaft system, gas distribution system, lubrication system,
cooling system of cylinder, Piston, Intake and exhaust valve, replace them when necessary.
4. Check fuel supplying system, adjust oil pump and injector.
5. Repair and test the alternator, clean oil-sediment and lubricate the bearing of alternator.
Overhaul (9000-15000hours)
1. Including the items of intermediate repair.
2. Disassemble all the parts in the generator.
3. Replace cylinder, piston, piston loop, big and small bearing bushes, trusting pad of crankshaft, intake
and exhaust valve, a whole set of tools for generator repair
4. Adjust oil pump, injector and replace pump core, injector
5. Replace a whole set of repair tools for turbo charger and a repair set for water pump.
6. Adjust the parts of connecting rod, crankshaft and generator body,repair or replace them when necessary
Strongly focused on innovation and the inherent flexibility of product design, Mecca Power has been successful in global markets with a broad and diverse range of genset power products that can operate autonomously or independently. parallel, on-site or remotely controlled.
- Brand new air cooled Beinei diesel engine generators ;
- 2 fuel tanks,one is 50L standard base fuel tank and another one is 2000L separately fuel tank.
- Set mounted with Deepsea DSE6020 digital controller. Breaker included.
- 24V DC Electric start system with maintenance free starting batteries and battery chargers .
- Genset will be with 8-10Hrs daily fuel tank.
- Low Noise -- Cylinder liner and crankcase are all made in high strength grey cast iron (German standard) with optimal design to reduce the noise and vibration
- Package: Generators will be packed in poly foam.
Powered by DEUTZ 50HZ 400/230 V 22-825KVA | |||||||||
Model | LTP | PRP | Engine | Displacement | Gov. | Dimention | Weight | ||
KVA/KW | KVA/KW | Model | L | L*W*H(MM) | KGS | ||||
MC22D | 22 | 18 | 20 | 16 | BFM3 G1 | 3.168 | E | 1600*880*1250 | 560 |
MC33D | 33 | 26 | 30 | 24 | BFM3 G2 | 3.168 | E | 1600*880*1250 | 582 |
MC44D | 44 | 35 | 40 | 32 | BFM3T | 3.168 | E | 1600*880*1250 | 640 |
MC55D | 55 | 44 | 50 | 40 | BFM3C | 3.168 | E | 1600*880*1250 | 680 |
MC66D | 66 | 53 | 60 | 48 | BF4M2012 | 4.040 | M | 1870*980*1500 | 970 |
MC83D | 83 | 66 | 75 | 60 | BF4M2012C G1 | 4.040 | M | 1960*980*1500 | 1010 |
MC99D | 99 | 79 | 90 | 72 | BF4M2012C G2 | 4.040 | E | 1960*980*1500 | 1040 |
MC110D | 110 | 88 | 100 | 80 | BF4M1013EC G1 | 4.764 | M | 2140*980*1700 | 1180 |
MC124D | 124 | 99 | 113 | 90 | BF4M1013EC G2 | 4.764 | E | 2140*980*1700 | 1220 |
MC138D | 138 | 110 | 125 | 100 | BF4M1013FC | 4.764 | E | 2140*980*1700 | 1310 |
MC176D | 176 | 141 | 160 | 128 | BF6M1013EC G1 | 7.146 | M | 2280*980*1700 | 1480 |
MC198D | 198 | 158 | 180 | 144 | BF6M1013EC G2 | 7.146 | E | 2280*980*1700 | 1590 |
MC206D | 206 | 165 | 188 | 150 | BF6M1013FC G2 | 7.146 | E | 2640*1150*1790 | 1710 |
MC220D | 220 | 176 | 200 | 160 | BF6M1013FC G3 | 7.146 | E | 2640*1150*1790 | 1760 |
MC248D | 248 | 198 | 225 | 180 | BF6M1015-LA GA | 11.906 | E | 2650*1520*2100 | 2320 |
MC275D | 275 | 220 | 250 | 200 | BF6M1015C-LA G1A | 11.906 | E | 2650*1520*2100 | 2320 |
MC303D | 303 | 242 | 275 | 220 | BF6M1015C-LA G2A | 11.906 | E | 2750*1520*2100 | 2510 |
MC344D | 344 | 275 | 313 | 250 | BF6M1015C-LA G3A | 11.906 | E | 2850*1520*2100 | 2520 |
MC385D | 385 | 308 | 350 | 280 | BF6M1015C-LA G4 | 11.906 | E | 2850*1520*2100 | 2610 |
MC413D | 413 | 330 | 375 | 300 | BF6M1015CP-LA G | 11.906 | E | 2950*1520*2100 | 2695 |
MC481D | 481 | 385 | 438 | 350 | BF8M1015C-LA G1A | 15.875 | E | 3100*1850*2240 | 3120 |
MC495D | 495 | 396 | 450 | 360 | BF8M1015C-LA G2 | 15.875 | E | 3100*1850*2240 | 3240 |
MC523D | 523 | 418 | 475 | 380 | BF8M1015CP-LA G1A | 15.875 | E | 3100*1850*2240 | 3300 |
MC550D | 550 | 440 | 500 | 400 | BF8M1015CP-LA G2 | 15.875 | E | 3100*1850*2240 | 3380 |
MC605D | 605 | 484 | 550 | 440 | BF8M1015CP-LA G4 | 15.875 | E | 3100*1850*2240 | 3450 |
MC619D | 619 | 495 | 563 | 450 | BF8M1015CP-LA G5 | 15.875 | E | 3100*1850*2240 | 3630 |
MC756D | 756 | 605 | 688 | 550 | HC12V132ZL-LAG1A | 23.812 | E | 3700*1600*2200 | 4200 |
MC825D | 825 | 660 | 750 | 600 | HC12V132ZL-LAG2A | 23.812 | E | 3700*1600*2200 | 4200 |
General Feature | ||||||||||||||||||
♦ Assembled by diesel engine and Brushless alternator. | ||||||||||||||||||
Three filters as standard, fuel and water separator as optional. | ||||||||||||||||||
♦ Radiator and fan with safety guard. | ||||||||||||||||||
♦ Single bearing alternator IP 23, Insulation Class H. | ||||||||||||||||||
♦ Heavy duty steel as base frame and 8hrs operation base fuel tank. | ||||||||||||||||||
♦ Automatic control panel and 3 poles circuit breaker, internal cable. | ||||||||||||||||||
♦ 12V or 24V battery, battery wires. | ||||||||||||||||||
♦ Battery and float battery charger as standard supply scope. | ||||||||||||||||||
♦ Fuel level indicator in meter and panel | ||||||||||||||||||
♦ Optional soundproof canopy, ATS, synchronization panel, movable trailers. |
Genset Main Technical Data | ||||||||||||||||||
Genset Model | MC22DC-MC825D | |||||||||||||||||
Prime Power | 16kW-600kW | |||||||||||||||||
Standby Power | 17.6KW-660kW | |||||||||||||||||
Frequency/Speed | 50Hz/1500rpm | |||||||||||||||||
Standard Voltage | 230/400V, Others as Application Requested | |||||||||||||||||
Phases | Three phases, four wires | |||||||||||||||||
Dimensions(L×W×H)mm | Open/Silent dimension as below list | |||||||||||||||||
100% Fuel Cons. (L/H) | 3.9~77.6 | |||||||||||||||||
Base Fuel tank (hour) | 8~10 |
Alternator Specifications | ||||||||||||||||||
Alternator Model | STAMFORD TAL/PI/UCI/HCI/LVI Series | |||||||||||||||||
Output power | 16kW-600kW | |||||||||||||||||
Voltage control | AVR | |||||||||||||||||
Number of phase | 3 | |||||||||||||||||
Power factor (Cos Phi) | 0.8 | |||||||||||||||||
Insulation Class | H | |||||||||||||||||
Number of Wires | 6 | |||||||||||||||||
Protection | 23 | |||||||||||||||||
Altitude | ≤ 1000 m | |||||||||||||||||
Number of Pole | 4 | |||||||||||||||||
Exciter type | AREP | |||||||||||||||||
Voltage regulation | ±0.5% | |||||||||||||||||
Totale Harmonic distortion | at no load < 4 % - on load < 4 % | |||||||||||||||||
Bearing | Single | |||||||||||||||||
Coupling | Direct |
Alternator Data | ||||||||||||||||||
♦ Operate either 50Hz or 60Hz. | ♦Stator grease insulation covered | |||||||||||||||||
♦ Standard enclosure IP23, but IP44, IP55 for option | ♦Rotator and excitation high polymer | |||||||||||||||||
♦ Insulation class H. | ♦ Resist the corruption oil and acid | |||||||||||||||||
♦ Shunt excitataion systems. | ♦Rotator balance is in accordance with BS5625 | |||||||||||||||||
♦ AREP or PMG system for options. | standard 12.5 | |||||||||||||||||
♦ Automatic voltage regulator | ♦High-quality lubrication sealed long-time bearing | |||||||||||||||||
♦ Single bearing alternator | ♦Rotator silicon steel close tight |
Standard Accessories | ||||||||||||||||||
*Auto Control Panel | *Starting Motor | |||||||||||||||||
*Main Ciruit Breaker | *Exhaust silencer | |||||||||||||||||
*Fuel tank | *Starting battery | |||||||||||||||||
*Base Frame | *Float battery charger | |||||||||||||||||
*Filter | *Flange |
Customerized Fuel Tank
1.Volume: 500L, 1000L,1500L,2000L,3000L etc.
2.Plate steel construction
3.Fuel level meter
4.Fuel transfer systems
5.Double wall
6.Electric fuel pump
7.Fuel level sensor (indicated on control module)
8.Fuel automatic filling system
9.Tank in genset base, top, built-in, seperately stand etc
Payment Terms:
By telegraphic transfer: 30% deposit on signing of sales contract; and balance 70% before dispatch.
Delivery:
Approximately 2-4 weeks upon order confirmation.
Service Guarantee:
Before Service: According to the clients' requirement and actual situation, we will furnish the technology consultation and kinds of information.
After Service: Guarantee for one year or 1200 running hours (accord to whichever reach first) from installed date.
During the guarantee period, we will provide the free easy-damaged spare-parts for problems caused by our quality of production or raw material, except the damageable spare parts of diesel engine caused by customer's incorrect man-made operation. After checking, our company provides cost spare-parts maintenance for gensets .
Beside genset one-stop purchasing service to world-wide customers,CKD and SKD packing service are also available according to unique request.
CKD:Complete Knock Down Generator
Generator completely knocked down into parts without assembling.
All items from following are seperately packed without connection.
SKD:Semi Knock Down Generator
Partially assembled generator.
Part of the following items you choose will be assembled.
Advantage:
Prompt delivery
Reduced tax to win more competition
Lower transportation fees to save cost
Localized production to win more tenders.
Increased production to offer more job opportunity for the government
Item | Service | Option | Delivery Time |
1 | Engine | Doosan, Mtu, Mitsubishi, SME, Volvo, Deutz, Yanmar, Faw, YangDong, Aoling, Yuchai, Lovol, Wandi, ect. Marine and industry use Diesel, gas | 2-45days |
2 | Alternator | Stamford, Leroysomer, Meccalte, Marathon and customer requested alternators Medium and high voltage, Marine and industry use High IP Grade CT Drop kits, PMG, AVR | 2-15 days |
3 | Radiator | Fast, Beworld brand Original Radiator come with engine Local made radiator with authorization by engine supplier | 2-7days |
4 | Canopies | Powder coated and form mounted canopy,completely break down with hings, locks, raincap,bolts,screws, etc. Exhaust pipe and flanges Standard silent type canopy package Denyo type canopy package Rental type canopy package Telecom type canopy package Super silent type canopy package Containerized type canopy package Customerized type canopy package | 10days |
5 | Base frame | Standard base or simple iron base Anti-Vibration mountings With/without tank, base tank volume no limited Fuel gauges and high pressure fuel pipes | 3days |
6 | Control system | Controller: ComAp, DeepSea, Datacom, SmartGen etc. Breaker:Delixi,ABB, Chint, etc. Battery switch, battery charger, emergency stop botton, indicator, meters, CT and all wiring and harness. Batteries and cables Speed & lub oil & water temp sensors, A package of standard parts for assembly | 3days |
7 | Exhaust System | Industrial and residential silencer Flexible connects and elbow | 3days |
8 | Others | Special demands |
-----------------------------------------------------------------------------------------------MAINTENANCE---------------------------------------------------------------------------------------------
General Troubleshooting
This section lists the generating set for some common fault, the reasons for the failure and determines the
method of fault. General operators can determine their own fault and note, maintenance it according to the
brochure. But please contact the repairing agents when meeting a special note or not listed failure of operation.
Please remember the following suggestions before repairing:
- Make sure that study the failure carefully before any operation.
- Repair with the easiest way and most commonly used method.
- Find the exact causes of failure and completely solve the fault.
1. Generator Sets
Description of this section is for reference only. If the following failure occurs please contact the repairing agents.
(Some models of control panel installed only parts of the following warning indicator light)
Icon | Indicator Light | Reason | Fault Analysis |
Low oil pressure alarm | Low oil pressure alarm | When oil pressure does not reduce normally, the light is on. | -General because of a lack of oil or lubrication system failure caused by (refueling or replacing the oil filter) -When occurs this fault should automatically shutdown generator sets immediately. |
High water temperature alarm | High water temperature alarm | When the water temperature has risen to a level higher than or equal to the sensor setting, the light is on. | -General because of a lack of water or oil shortage, or overload. -When occurs this fault should automatically shutdown generator sets immediately. |
Low fuel level alarm | Low fuel level alarm | When a fuel level has been detected by the sensor fitted to the daily tank, the light is on. | -General because of a lack of water or oil shortage, or overload. -When occurs this fault should automatically shutdown generator sets immediately. |
Battery charger fault alarm | Battery charger fault alarm | If the charging system has fault, when engine running, the light is off. | -Battery charging system fault caused. -The light is on at the initial start, when the charger reaches a certain speed, the light is off. -This failure will not lead to automatic shutdown generating units. |
Crank failure alarm | Crank failure alarm | When the generator set failed three times (or six times) in a row starting, the light is on. | -Oil supply system or re-start the system failure caused. |
Overload or breaker tripping alarm | Overload or breaker tripping alarm | When overloading or Short circuit, the light is on. Tripping circuit breakers cause generator set load out. | -In this fault, it need to load or unload some parts to eliminate short-circuit, and then re-close the circuit breaker. |
Introduction of Maintenance grade(Interval) for the generator set
A Level Maintenance Interval (Daily Maintenance)
1. Check Daily Report of Genset .
2. Check fuel level and coolant level.
3. Check alternator for cracks or other damage, and the condition of the belts must be checked, flab or
other damage.
4. Check the Air filter. The air filter should be replaced when necessary .
5. Release fuel tank and fuel filter's water and sediment.
6. Check the water cooling filter.
7. Check starting battery and electrolyte, add electrolyte when necessary.
8. Check the starter, check noisy defect.
9. Use air syringe cleaner to clean the water tank, coolant system and cooled fin net.
B Level Maintenance Interval (Less than 400 hours)
1. Repeatedly check A Level Daily Maintenance steps.
2. After operating 100 to 250 hours, replace the fuel filter. All the fuel filters should not be cleaned, it
should be replaced. 100 to 250 hours is just flexible time, actually it must be according to the practice
and real fact.
3. After operating 200 to 250 hours, replace the oil & oil filter. All the lube oil must fit up to the CF
Grade of American Petroleum Institute.
4. After operating 300 to 400 hours, replace the air filter. The air filter can be cleaned with air syringe, or
it can be replaced. The replacement must be according to the environment and real fact.
5. Replace the cooling system and add coolant concentration.
6. Clean the crankshaft and inlet, outlet air- filter net.
C Level Maintenance Interval (2000-3000 hours), Please do as follows:
1. Repeatedly check A and B Level Daily Maintenance steps.
2. Remove the tap of valve, clean and wash oil dirt and sludge.
3. Fasten snails from each part (including running parts and fixed parts)
4. Clean and wash the crankcase, oil sludge, steel scraps and sediment with engine.
5. Check wearing of the engine turbo, clean and wash accumulation of carbon, adjust it when necessary.
6. Check and adjust valve clearance.
7. Check PT pump, quality of injection, adjust injection process, adjust it when necessary.
8. Check and adjust the tension of fan belt and water pump belt, adjust and replace it when necessary;
clean and wash water tank radiator fins, then check the using capability of thermostat.
Current Repair (D Level Maintenance)(3000-4000 hours)
1. Check valve, valve seat and other wearing, repair or change it when necessary.
2. Check P pump, quality of injection, repair and adjust it when necessary.
3. Check and adjust connecting rod and fastening twisting torque.
4. Check and adjust valve clearance.
5. Check the trip of injector.
6. Check and adjust tension of fan and generating belt.
7. Clean and wash accumulation of carbon in inlet pipes.
8. Clean and wash the core of air cooler.
9. Clean and wash the whole oil lubrication system.
10. Clean and wash room of rocker arm, oil sludge in the sump and Metal scrap-iron.
Medium Repair (6000-8000 hours)
1. Including the items of minor repair.
2. Disassemble generator(except crankshaft)
3. Check the easy worn spare parts in pitman shaft system, gas distribution system, lubrication system,
cooling system of cylinder, Piston, Intake and exhaust valve, replace them when necessary.
4. Check fuel supplying system, adjust oil pump and injector.
5. Repair and test the alternator, clean oil-sediment and lubricate the bearing of alternator.
Overhaul (9000-15000hours)
1. Including the items of intermediate repair.
2. Disassemble all the parts in the generator.
3. Replace cylinder, piston, piston loop, big and small bearing bushes, trusting pad of crankshaft, intake
and exhaust valve, a whole set of tools for generator repair
4. Adjust oil pump, injector and replace pump core, injector
5. Replace a whole set of repair tools for turbo charger and a repair set for water pump.
6. Adjust the parts of connecting rod, crankshaft and generator body,repair or replace them when necessary